( 1 pt ) Using the assembly - line balancing procedure, which of the following is the required cycle time in minutes per unit if
pt Using the assemblyline balancing procedure, which of the following is the required cycle time in minutes per unit if the daily production time is minutes and the required daily output is units?
A
B
C
D
E Cannot be determined from the information above