Question
1.) Sparrow Manufacturing manufactures small parts and uses an activity-based costing system. Activity Est. Indirect Activity Costs Allocation base Cost allocation rate Materials $70,000 Material
1.) Sparrow Manufacturing manufactures small parts and uses an activity-based costing system.
Activity | Est. Indirect Activity Costs | Allocation base | Cost allocation rate |
Materials | $70,000 | Material moves | $2.00/move |
Assembling | $240,000 | Direct labor hours | $8.00/dir. labor hour |
Packaging | $80,000 | # of finished units | $0.80/finished unit |
The following parts were produced in October with the following information:
Part | # Produced | Materials Costs | # Moves | Dir. Labor Hrs. |
A | 2,500 | $2,500 | 800 | 200 |
B | 3,500 | $7,000 | 1,500 | 300 |
C | 4,500 | $11,250 | 2,200 | 1,000 |
Total unit cost for part B is:
a. $2.34.
b. $3.08.
c. $6.06.
d. $4.34.
2.) Kepple Manufacturing currently uses a traditional costing system. The company allocates overhead to its two products, Zips and Dees, using a predetermined manufacturing overhead rate based on direct labor hours. Here is data related to the company's two products:
Zips | Dees | |
Direct materials per unit | $ 140.00 | $ 100.00 |
Direct labor per unit | $ 55.00 | $ 50.00 |
Direct labor hours per unit | 2.0 | 1.5 |
Annual production | 25,000 | 40,000 |
Information about the company's estimated manufacturing overhead for the year follows:
Activities | Activity measures | Estimated overhead cost |
Supervision and maintenance | Direct labor hours | $2,200,000 |
Batch costs | Number of batches | $ 212,500 |
Engineering changes | Number of engineering hours | $ 180,000 |
Total estimated manufacturing overhead for the year | $2,592,500 |
Total estimated direct labor hours for the company for the year are 110,000 hours. The company is evaluating whether it should use an activity-based costing system in place of its traditional costing system. Additional information about production needed for the activity-based costing system follows:
Expected activity | |||
Zips | Dees | Total | |
Direct labor hours | 50,000 | 60,000 | 110,000 |
Setups | 2,000 | 500 | 2,500 |
Part types | 1,800 | 1,200 | 3,000 |
The amount of manufacturing overhead that would be allocated to one unit of Zips using the traditional costing system would be closest to:
a. $23.57.
b. $32.86.
c. $35.35.
d. $47.14.
3.) Kepple Manufacturing currently uses a traditional costing system. The company allocates overhead to its two products, Zips and Dees, using a predetermined manufacturing overhead rate based on direct labor hours. Here is data related to the company's two products:
Zips | Dees | |
Direct materials per unit | $ 140.00 | $ 100.00 |
Direct labor per unit | $ 55.00 | $ 50.00 |
Direct labor hours per unit | 2.0 | 1.5 |
Annual production | 25,000 | 40,000 |
Information about the company's estimated manufacturing overhead for the year follows:
Activities | Activity measures | Estimated overhead cost |
Supervision and maintenance | Direct labor hours | $2,200,000 |
Batch costs | Number of batches | $ 212,500 |
Engineering changes | Number of engineering hours | $ 180,000 |
Total estimated manufacturing overhead for the year | $2,592,500 |
Total estimated direct labor hours for the company for the year are 110,000 hours. The company is evaluating whether it should use an activity-based costing system in place of its traditional costing system. Additional information about production needed for the activity-based costing system follows:
Expected activity | |||
Zips | Dees | Total | |
Supervision and maintenance | 50,000 | 60,000 | 110,000 |
Batch costs | 2,000 | 500 | 2,500 |
Engineering changes | 1,800 | 1,200 | 3,000 |
The amount of manufacturing overhead that would be allocated to one unit of Zips using an activity-based costing system would be closest to:
a. $11.95.
b. $51.12.
c. $32.86.
d. $64.81.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started