1. Work Breakdown Structure (2530 items) - Create WiS in MS Word using either tabular or chart form - Minimum 3 kivos of work in your WOS (levels 1 and 2 are provided in the cise) - Minimum 3 wokk packagos at level 3 2. Detailed Project Schedule (Ganti Chat - 80-100 iterns) - First activity should be proyect namo l your name / studont number - Create activities from the work you created in the wes. - Inclode sumanary task - Task dogendencies with proper inks - At least 1 activity with Finish to Finish dependency - At least 1 activity with Start lo Start dependency - ISentify milestones - Resource details - Add the following work resources: Ste Superintendent, Security Team, Demo Team (apoly So04 to units), Conctete Team and Steel Workers - Add a cost resource callod inspoctions (add cost of 520,000 ) - Resources assignod to tasks - Calendar - Activity Table (below - for a baseline) - Some of the durabions in the table are blank You must decide on a duration to use tor each of those activies - Expand activities to include sub activities. The total number of activites of your projoct shocid be botwen 80.100 basks a. Narsative - 150250 words that describes the logic behind your WOS and MS Prosect Fle (do not repeat the quesbon) The City of Toronto has progressed on so many fronts since the October 2019 municipal oiection saw a liberal minded mayor ulocted to office. The dark, backovard days of former Mayor Bobby Bored and his conservativo, havkish brother are a distant memoty In addition to new public transit plans, the city moved quickly to intato a propoct to teplace its professicnal basobali stadium The current stadium, buit in the late 19B0 s is outdated and genotaly recognized as the worst professional stadiurn in North Amenca The G8E Company is proparing a bid to build the new 74,000 seat Avignon Stadium (named aflor a beautitul town in southem Franco). The construction must start June 12020 , and be completed in time for the start of the 2024 season. A panally clause of $100000 per day of dolay beyond Aprit 20 . 2024, is wnitten into the contrect Ben Keith, the president of the company, expressed optimism at obtaining the contract and revuaied that the compary could net as much as $5 milloa on the project. He also said it they are successful, the prospects for future propects are quite good since there is a projected renaissance in buibling ciassic basebal parks with modern laxury boxes Arcivity Table 1 Baseball Stadium 2 Clear stadium site 70 days 3 Demolish building 30 days 2 4 Set up construction site days 3 5 Drive support piling 120 days 2 6 Pour lower concrete bowl days 7 Pour main concourse 120 days 3,6 8 Install playing field 90 days 3,6 9 Construct upper steel bowl 120 days 3,6 10 Install seats 140 days 7,9 11 Build luxury boxes 90 days 7,9 12 Install electronic 30 days 7,9 scoreboards Stadium infrastructure 120 days 7,9 14 Construct steel canopy 75 days 10 15 Light installation 30 days 14 141516171819ConstructsteelcanopyLightinstallationBuildroofsupportsConstructroofInstallrooftracksInstallroof75days30days90daysdays90days90days101461616,188,11,13,15,19 Case Description - Avignon Baseball Stadium The basetall stadium is an outdoor structure with a retractable roof. The projoct begins with clearing the sile (activity 2 ) Once the site is clear, work can start simultaneously on the structure iteelf and demolishing an adjacent building site (activity 3). This demolition is necossary to create-a constiuction stapje for storing materials and equipment (activity 4 ) The work on the stadium begins by driving 160 suppoit pilings (activily 5 ). Next comes the pouning of be lower concrete bowl (actinty 6 ) Once this s done and the construction sile has been set up, then the pouring of the main concourse (activity 7 ), the installation of the plasying fieid (activily a), and the construction of the upper steel bowi can occur (activity 9 ). Once the concourse and upper bowi are completed, work can start simuitaneously on builing the luxury boxes (activiy 11 ), instaling the seats factivity 10), instaling the electronic scoroboards (activity 12), and instaling stadium infrastructure (adivity 13) which incluges. bathrooms, lockers, restaurants, etc Once the seats are installed then the steel canopy can be constructed (activity 14) followod by the instalation of the ights (activily 15 ). The rotractable roof represents the most significant technicat challenge to the projed. Building the roof track supports (activiy 16 ) can begn athar the lower concrete bowi is construcled. At this time the dimensions of the roof can be finalized and the construction of the roof at a separule site can begin (activity 17). After the roof supgorts are completed then the toof tracks can be instalied (activity +8 ) and made operational (90 days). Once al activities are complated the stadium can bo inspected (activity 20 ) For purpeses of this case assume the following 1. The following holidays are observed. January 1, Victoria Day (third Monday in May), Canada Day (July 1%, Labor Day (first Monday in September). Thanksgiving Day (second Monday in October), December 25 and 26 (Christmas Day and Boxing Day)? 2. If a toliday tals on a Saturday then Friday wil be given as an extra day otf, and if it fals on a Sunday then Monday will be given as a day off if a hoiday tals on a Saturday of Sunday and the Friday or Monday are also a holiday, the non-holiday Monday or Friday will be gven as an extra day olt. 3. The constructiont crews work Monday inrough Friday Work days are 8 hours 1. Work Breakdown Structure (2530 items) - Create WiS in MS Word using either tabular or chart form - Minimum 3 kivos of work in your WOS (levels 1 and 2 are provided in the cise) - Minimum 3 wokk packagos at level 3 2. Detailed Project Schedule (Ganti Chat - 80-100 iterns) - First activity should be proyect namo l your name / studont number - Create activities from the work you created in the wes. - Inclode sumanary task - Task dogendencies with proper inks - At least 1 activity with Finish to Finish dependency - At least 1 activity with Start lo Start dependency - ISentify milestones - Resource details - Add the following work resources: Ste Superintendent, Security Team, Demo Team (apoly So04 to units), Conctete Team and Steel Workers - Add a cost resource callod inspoctions (add cost of 520,000 ) - Resources assignod to tasks - Calendar - Activity Table (below - for a baseline) - Some of the durabions in the table are blank You must decide on a duration to use tor each of those activies - Expand activities to include sub activities. The total number of activites of your projoct shocid be botwen 80.100 basks a. Narsative - 150250 words that describes the logic behind your WOS and MS Prosect Fle (do not repeat the quesbon) The City of Toronto has progressed on so many fronts since the October 2019 municipal oiection saw a liberal minded mayor ulocted to office. The dark, backovard days of former Mayor Bobby Bored and his conservativo, havkish brother are a distant memoty In addition to new public transit plans, the city moved quickly to intato a propoct to teplace its professicnal basobali stadium The current stadium, buit in the late 19B0 s is outdated and genotaly recognized as the worst professional stadiurn in North Amenca The G8E Company is proparing a bid to build the new 74,000 seat Avignon Stadium (named aflor a beautitul town in southem Franco). The construction must start June 12020 , and be completed in time for the start of the 2024 season. A panally clause of $100000 per day of dolay beyond Aprit 20 . 2024, is wnitten into the contrect Ben Keith, the president of the company, expressed optimism at obtaining the contract and revuaied that the compary could net as much as $5 milloa on the project. He also said it they are successful, the prospects for future propects are quite good since there is a projected renaissance in buibling ciassic basebal parks with modern laxury boxes Arcivity Table 1 Baseball Stadium 2 Clear stadium site 70 days 3 Demolish building 30 days 2 4 Set up construction site days 3 5 Drive support piling 120 days 2 6 Pour lower concrete bowl days 7 Pour main concourse 120 days 3,6 8 Install playing field 90 days 3,6 9 Construct upper steel bowl 120 days 3,6 10 Install seats 140 days 7,9 11 Build luxury boxes 90 days 7,9 12 Install electronic 30 days 7,9 scoreboards Stadium infrastructure 120 days 7,9 14 Construct steel canopy 75 days 10 15 Light installation 30 days 14 141516171819ConstructsteelcanopyLightinstallationBuildroofsupportsConstructroofInstallrooftracksInstallroof75days30days90daysdays90days90days101461616,188,11,13,15,19 Case Description - Avignon Baseball Stadium The basetall stadium is an outdoor structure with a retractable roof. The projoct begins with clearing the sile (activity 2 ) Once the site is clear, work can start simultaneously on the structure iteelf and demolishing an adjacent building site (activity 3). This demolition is necossary to create-a constiuction stapje for storing materials and equipment (activity 4 ) The work on the stadium begins by driving 160 suppoit pilings (activily 5 ). Next comes the pouning of be lower concrete bowl (actinty 6 ) Once this s done and the construction sile has been set up, then the pouring of the main concourse (activity 7 ), the installation of the plasying fieid (activily a), and the construction of the upper steel bowi can occur (activity 9 ). Once the concourse and upper bowi are completed, work can start simuitaneously on builing the luxury boxes (activiy 11 ), instaling the seats factivity 10), instaling the electronic scoroboards (activity 12), and instaling stadium infrastructure (adivity 13) which incluges. bathrooms, lockers, restaurants, etc Once the seats are installed then the steel canopy can be constructed (activity 14) followod by the instalation of the ights (activily 15 ). The rotractable roof represents the most significant technicat challenge to the projed. Building the roof track supports (activiy 16 ) can begn athar the lower concrete bowi is construcled. At this time the dimensions of the roof can be finalized and the construction of the roof at a separule site can begin (activity 17). After the roof supgorts are completed then the toof tracks can be instalied (activity +8 ) and made operational (90 days). Once al activities are complated the stadium can bo inspected (activity 20 ) For purpeses of this case assume the following 1. The following holidays are observed. January 1, Victoria Day (third Monday in May), Canada Day (July 1%, Labor Day (first Monday in September). Thanksgiving Day (second Monday in October), December 25 and 26 (Christmas Day and Boxing Day)? 2. If a toliday tals on a Saturday then Friday wil be given as an extra day otf, and if it fals on a Sunday then Monday will be given as a day off if a hoiday tals on a Saturday of Sunday and the Friday or Monday are also a holiday, the non-holiday Monday or Friday will be gven as an extra day olt. 3. The constructiont crews work Monday inrough Friday Work days are 8 hours