Question
10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? 11. Using the plantwide overhead rate, what percentage
10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?
11. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal place.)
12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal places.)
13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal places.)
14. Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and Product Z?
15. Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal place.)
(The following information applies to the stions displayed below. Hickory Company manufactures two products14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all $791,400 of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Product design General factory Activity Measure Machine-hours Number of setups Number of products Direct labor-hours Estimated Overhead Cost $ 200,000 $ 121,900 $ 87,000 $ 379,500 Expected Activity 10,000 MHS 230 setups 2 products 12,000 DLHS Activity Measure Machine-hours Number of setups Number of products Direct labor-hours Product Y 7,300 50 1 9,500 Product z 2,700 180 1 2,500 9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round all intermediate calculations to 2 decimal places.) Total manufacturing overhead costStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started