Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Assuming you are a geotechnical engineer in charge of a highway project involving construction of an embankment. The soil will be transported from a

 Assuming you are a geotechnical engineer in charge of a highway project involving construction of an 

Assuming you are a geotechnical engineer in charge of a highway project involving construction of an embankment. The soil will be transported from a soil borrowing site. A number of soil tests were performed including property tests, soil classification tests and soil compaction tests. (A) At the borrowing site, a partially saturated sandy soil sample was taken, and it has a volume of 450 ml (1 ml = 1 cm3). The mass of this sandy soil is 816 g. After 24hr oven drying in the laboratory, the mass reduces to 760 g. Gs =2.7. Calculate: A-1. Water content of the sample. (1 mark) A-2. Total volume of soil particle in the sample. (1 mark) A-3. Total volume of pore water in the sample. (1 mark) A-4. Void ratio of the sample. (1 mark) A-5. Degree of saturation of the sample. (1 mark)

Step by Step Solution

3.53 Rating (150 Votes )

There are 3 Steps involved in it

Step: 1

A1 Volume of soil sample V 150ml 450 cm Total mass of ... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Mechanics of Materials

Authors: James M. Gere, Barry J. Goodno

7th edition

495438073, 978-0495438076

More Books

Students also viewed these Civil Engineering questions