Answered step by step
Verified Expert Solution
Question
1 Approved Answer
13. Anguilla Manufacturing is interested in using the data collected during value stream mapping to evaluate the current state performance of the capacity of its
13. Anguilla Manufacturing is interested in using the data collected during value stream mapping to evaluate the current state performance of the capacity of its manual assembly line process under different batch size assumptions. The availability of processing per shift, after accounting for breaks and a mid-shift employee meeting, is 436 minutes. The current operating characteristics of each processing step are found in the accompanying table. Note that each step can process only one part at a time and all steps must process the same sized batches. a. Calculate the average processing time per unit and the capacity at each step assuming batch sizes of: 1. 10 units ii. 20 units lil. 30 units iv. 40 units b. Identify the bottleneck operation and the line's processing capacity for each batch size listed in part (a). c. Explain why batch sizes beyond 40 units will not increase the line's processing capacity further
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started