Answered step by step
Verified Expert Solution
Question
1 Approved Answer
{15pm} A research engineer studied the time efciency of tour construction methods (A, B. C. D} for an electronic component. Four technicians were selected for
{15pm} A research engineer studied the time efciency of tour construction methods (A, B. C. D} for an electronic component. Four technicians were selected for the study. The construction process produces fatigue such that the required construction time by the technicians increases as they change from one method to another regardless oi the order of construction methods. The engineer used a Latin square design with columns as 'technician' and row as 'time period". The construction methods were randomized to the mmcians and time periods according to the Latin square arrangement. The values are construction times in minutes required for the component with the construction method indicated in parentheses. Time period Technician 2 3 4 1 90 (C) 96 (D) 84 (A) 88 (B) 2 90 (B) 91 (C) 96 (D) 88 (A) 3 89 (A) 97 (B) 98 (C) 98 (D) 4 104 (D) 100 (A) 104 (B) 106 (C) Please construct the ANOVA table. At significance level 0.01, do the construction method, technician and experiment time period have significant impacts on the time efficiency? Source of Degree of Sum of Mean F P variation freedom squares square Total Time Technician Methods Error
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started