Answered step by step
Verified Expert Solution
Question
1 Approved Answer
$16 Question #4 Halle Brothers is trying to establish the standard labor cost of a typical water pump repair. The following data have been collected
$16 Question #4 Halle Brothers is trying to establish the standard labor cost of a typical water pump repair. The following data have been collected from time and motion studies conducted over the past month. Actual time spent on rump repair 1.0 hour Hourly wage rate Payroll taxes 10% of wage rate Onsite setup and downtime 10% of actual labor time Final adjustments and testing 20% of actual labor time Fringe benefits 25% of wage rate Required (a) Determine the standard direct labor hours per pump repair (b) Determine the standard direct labor hourly rate. (c) Determine the standard direct labor cost per pump repair. (d) If a pump repair took 1.5 hours at the standard hourly rate, what was the direct labor quantity variance
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started