Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

1-The definition of use case is: a)An informal method of interviews to gather requirements b)A diagramming tool c)It is a CASE tool d)A formal method

1-The definition of use case is:

a)An informal method of interviews to gather requirements

b)A diagramming tool

c)It is a CASE tool

d)A formal method used by the System Analyst to document the system interaction with its actors

e)None of the above

2-John is worried about the company using the new system. This would be considered part of:

a)Technical feasibility

b)Organizational feasibility

c)Economic feasibility

d)Risk feasibility

e)Hardware feasibility

3-One of the most important tasks in developing the use case is:

a)Identify all the major steps in the use case

b)Looking up other references

c)Listing the design process

d)Implementing the programs

e)None of the above

4-Which of the following is NOT a part of the use case:

a)Use case name and number

b)Information of steps

c)Data Flow Diagram

d)Importance level

e)None of the above

Peter is doing an economic analysis using todays dollar values. He is doing:

a)Cash flow analysis

b)Return on investment analysis

c)Net present value analysis

d)Break-even point analysis

e)Internal rate of return analysis

Question

True/False

1

CASE stands for Computer Aided Service Engineering.

2

Management of requirements and system scope is one of the hardest parts of managing a project.

3

In RAD or agile development methodology (especially with BPR), a significant amount of time and effort is spent in understanding the as-is system.

4

The primary goal of a system is to create value for the organization.

5

Using industry standards, the general estimated project time for the implementation phase is 15%.

6

In use case, an actor must be a person that interacts with the system.

7

Use case model is an external or functional-view of the business process.

8

Being a systems analyst is one of the most interesting, exciting and challenging jobs available.

9

Use case is only used to describe the current existing system, NOT the proposed system.

10

JAD stands for Joint Application Design.

11

Use case diagram represent actors in the use case as human matchstick figure even if the actor is non-human.

12

Once the list of interviews is determined, it rarely grows.

13

The most commonly used requirements gathering technique is the interview.

14

The project methodology that takes the longest to complete is Throwaway Prototyping Methodology.

15

A temporal trigger means an action that is taken as a result of the actor clicking an input button.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Banking On Freedom Black Women In U.S. Finance Before The New Deal

Authors: Shennette Garrett-Scott

1st Edition

0231183917, 978-0231183918

More Books

Students also viewed these Finance questions