Question
1-The definition of use case is: a)An informal method of interviews to gather requirements b)A diagramming tool c)It is a CASE tool d)A formal method
1-The definition of use case is:
a)An informal method of interviews to gather requirements
b)A diagramming tool
c)It is a CASE tool
d)A formal method used by the System Analyst to document the system interaction with its actors
e)None of the above
2-John is worried about the company using the new system. This would be considered part of:
a)Technical feasibility
b)Organizational feasibility
c)Economic feasibility
d)Risk feasibility
e)Hardware feasibility
3-One of the most important tasks in developing the use case is:
a)Identify all the major steps in the use case
b)Looking up other references
c)Listing the design process
d)Implementing the programs
e)None of the above
4-Which of the following is NOT a part of the use case:
a)Use case name and number
b)Information of steps
c)Data Flow Diagram
d)Importance level
e)None of the above
Peter is doing an economic analysis using todays dollar values. He is doing:
a)Cash flow analysis
b)Return on investment analysis
c)Net present value analysis
d)Break-even point analysis
e)Internal rate of return analysis
Question | True/False | |
1 | CASE stands for Computer Aided Service Engineering. | |
2 | Management of requirements and system scope is one of the hardest parts of managing a project. | |
3 | In RAD or agile development methodology (especially with BPR), a significant amount of time and effort is spent in understanding the as-is system. | |
4 | The primary goal of a system is to create value for the organization. | |
5 | Using industry standards, the general estimated project time for the implementation phase is 15%. | |
6 | In use case, an actor must be a person that interacts with the system. | |
7 | Use case model is an external or functional-view of the business process. | |
8 | Being a systems analyst is one of the most interesting, exciting and challenging jobs available. | |
9 | Use case is only used to describe the current existing system, NOT the proposed system. | |
10 | JAD stands for Joint Application Design. | |
11 | Use case diagram represent actors in the use case as human matchstick figure even if the actor is non-human. | |
12 | Once the list of interviews is determined, it rarely grows. | |
13 | The most commonly used requirements gathering technique is the interview. | |
14 | The project methodology that takes the longest to complete is Throwaway Prototyping Methodology. | |
15 | A temporal trigger means an action that is taken as a result of the actor clicking an input button. |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started