Question
1,WhichGiven the following information, formulate the aggregate production planning gives the total cost of 124,730. Machine Demand forecast 550 700 750 Capacity (maximum) Regular 500
1,WhichGiven the following information, formulate the aggregate production planning gives the total cost of 124,730. Machine Demand forecast 550 700 750 Capacity (maximum) Regular 500 500 500 Overtime 50 50 50 Part time 120 120 100 Beginning inventory 100 Costs Regular time $ 60 per unit Over time $ 80 per unit Part time $ 90 per unit Inventory holding cost $ 1 per unit per month Back order cost $ 3 per unit per month Suppose that regular-time capacity in month 3 will be reduced to 440 units to accommodate a company wide safety inspection of equipment. What will the additional cost of the optimal plan be as compared to the total cost of the plan given above. Assume all input data are the same as given except for the regular-time capacity in month 3. Additional cost of the optimal plan $ stage in the analysis of the external environment might be described as the attempt to identify early signals of change and trends in the environment?
Given the following information, formulate the aggregate production planning gives the total cost of 124,730. Machine Demand forecast 550 700 750 Capacity {maximum} Regular 500 500 500 Overtime 50 50 50 Part time 120 120 100 Beginning inventory 100 Costs Regular time $60 per unit Over time $30 per unit Part time $90 per unit Inventory holding cost $1 per unit per month Back order cost $3 per unit per month Suppose that regular-time capacity in month 3 will be reduced to 440 units to accommodate a company wide safety inspection of equipment. What will the additional cost of the optimal plan be as compared to the total cost of the plan given above. Assume all input data are the same as given except for the regular-time capacity in month 3. Additional cost of the optimal plan $ Owens Corning Fiberglas (OCF) makes several types, weights, and widths of Fiberglas mats from chopped strands of fibreglass for boat hulls on two production lines in a plant. Aggregate planning for OCF involves choosing a certain number of shifts (1 to 4, Le, 40, 80, 120, or 160 hours ofoperation per week), depending on forecast demand. MP5 is determined by optimization. minimizing product change-over, production, and inventory costs. Product change-over takes between 0.5 and 1 hour, and is sequence dependent, taking longest for fiberglass type change, and least for width change. Change-over cost includes loss of prot, direct labour, and mat waste. For simplicity, we will consider only one production line and two products: light (3/4 ounce/ft, 76 inches wide), and heavy (1.5 ounces/ft , 76 inches wide) mats. The forecast for the next eight weeks for light mat is 110,000 pounds, and for heavy mat is 120,000 pounds. Given the aggregate plan, the line can make 370,000 pounds of light or 185,000 pounds of heavy mats during each of the next eight weeks. Instead of optimization we will use the Economic Production Quantity EPO for each mat. a. If product change-over cost from heavy to light is $1,100 and from light to heavy is $1,500, holding cost rate is 12% per year, price of light mat is $0.75 per pound, price of heavy mat is $0.50 per pound, and demand occurs 50 weeks a year, calculate the EPQ for each product. (Enter the answers in thousand pounds.) EPQ Light pounds Heavy pounds b. If there are 230,000 pounds of light and 240,000 pounds of heavy mats on hand, determine which product will run out first. C Light 0 Heavy c. Determine the planned production for the two products so that neither product's projected on hand becomes negative, but their production lot sizes are close to their EPQ. If one of the products will be short, interrupt the production of the other and start making the short product. (Enter the answers in thousand pounds. Do not leave any empty spaces; input a "0" wherever it is required.) Light mat: Week Forecast 110 110 110 110 110 110 110 110 Committed Projected on hand (min = O] 120 Produce (lot size = 370) Availablecopromiae Heavy mat: Week Forecast 120 120 120 120 120 120 120 120 Committed Projected on hand (min = 0) 120 Produce (lot size = 185 X 3} AvailablecopromiseStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started