Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

2. A Coal Fired Power Plant has a capacity of 200MW with a load factor of 70% and efficiency of 45%. Coal being utilized is

image text in transcribed
2. A Coal Fired Power Plant has a capacity of 200MW with a load factor of 70% and efficiency of 45%. Coal being utilized is from Semirara with the following analysis: S1.5%, Ash 10% (assume 80% is fly ash), Calorific Value 35MJ/Kg. FGD Scrubber (sulfur removal) is installed with an efficiency of 99.9%. Scrubber removed 60% of the fly ash and 90% of SO2. Determine: a. Total coal requirement b. Sulfur Dioxide c. Ash d. Total final Air emission in terms of TSP and SO2

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Principles And Modern Applications Of Mass Transfer Operations

Authors: Jaime Benitez

3rd Edition

1119042739, 978-1119042730

More Books

Students also viewed these Chemical Engineering questions

Question

4 How can you create a better online image for yourself?

Answered: 1 week ago