2. A Coal Fired Power Plant has a capacity of 200MW with a load factor of 70% and efficiency of 45%. Coal being utilized is
2. A Coal Fired Power Plant has a capacity of 200MW with a load factor of 70% and efficiency of 45%. Coal being utilized is from Semirara with the following analysis: S1.5%, Ash 10% (assume 80% is fly ash), Calorific Value 35MJ/Kg. FGD Scrubber (sulfur removal) is installed with an efficiency of 99.9%. Scrubber removed 60% of the fly ash and 90% of SO2. Determine: a. Total coal requirement b. Sulfur Dioxide c. Ash d. Total final Air emission in terms of TSP and SO2