Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

2. Suppose that the output process from a queueing simulation is L(t), 0 s ts T, the total number in queue at time t. A

image text in transcribed

2. Suppose that the output process from a queueing simulation is L(t), 0 s ts T, the total number in queue at time t. A continuous-time output process can be converted into the sort of discrete-time process Y, Y2,... described in this chapter by first forming k -T/m batch means of size m time units: L(t) dt forj= 1, 2, k Ensemble averages of these batch means can be plotted to check for initial- condition bias a. Show algebraically that the batch mean over 2m time units can be obtained by averaging two adjacent batch means over m time units. [Hint. This implies that we can start with batch means over rather small time intervals m and build up batch means over longer intervals without reanalyzing all of the data.] b. Simulate an MM/ 1 queue with -1 and -1.25 for a run length of 4000 time units, computing batch means of the total number in queue with batch size m 4 time units. Make replications and use a mean plot to determine an appropriate number of batches to delete. Convert this number of batches to delete into a deletion time. 2. Suppose that the output process from a queueing simulation is L(t), 0 s ts T, the total number in queue at time t. A continuous-time output process can be converted into the sort of discrete-time process Y, Y2,... described in this chapter by first forming k -T/m batch means of size m time units: L(t) dt forj= 1, 2, k Ensemble averages of these batch means can be plotted to check for initial- condition bias a. Show algebraically that the batch mean over 2m time units can be obtained by averaging two adjacent batch means over m time units. [Hint. This implies that we can start with batch means over rather small time intervals m and build up batch means over longer intervals without reanalyzing all of the data.] b. Simulate an MM/ 1 queue with -1 and -1.25 for a run length of 4000 time units, computing batch means of the total number in queue with batch size m 4 time units. Make replications and use a mean plot to determine an appropriate number of batches to delete. Convert this number of batches to delete into a deletion time

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Understanding Oracle APEX 5 Application Development

Authors: Edward Sciore

2nd Edition

1484209893, 9781484209899

More Books

Students also viewed these Databases questions

Question

4. Did the presenter offer a clear and memorable summary?

Answered: 1 week ago