Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

2. (The road O) Refer to the transportation alternatives problem of Example 5.2. The bridge at Cay Road is actually part of the road between

image text in transcribedimage text in transcribed

2. (The road O) Refer to the transportation alternatives problem of Example 5.2. The bridge at Cay Road is actually part of the road between Augen and Burger. Therefore it is not reasonable for the bridge to have fewer lanes than the road itself. This means that if projects 2 or 4 are carried out, either projects 6 or 7 must also be carried out. Formulate a zero-one programming problem that includes this additional requirement. Solve the problem. TABLE 5.2 TRANSPORTATION ALTERNATIVES Cost ($1,000) NPV ($1,000) 2,000 3,000 1,500 2,200 4,000 5,000 3,000 4,300 Road between Augen and Burger 1 Concrete, 2 lanes 2 Concrete, 4 lanes 3 Asphalt, 2 lanes 4 Asphalt, 4 lanes Bridge at Cay Road 5 Repair existing 6 Add lane 7 New structure Traffic Control in Downsberg 8 Traffic lights 9 Turn lanes 10 Underpass 500 1,500 2,500 1,000 1,500 2,500 100 600 1,000 300 1,000 2,000 At most one project can be selected for each major objective. 2. (The road O) Refer to the transportation alternatives problem of Example 5.2. The bridge at Cay Road is actually part of the road between Augen and Burger. Therefore it is not reasonable for the bridge to have fewer lanes than the road itself. This means that if projects 2 or 4 are carried out, either projects 6 or 7 must also be carried out. Formulate a zero-one programming problem that includes this additional requirement. Solve the problem. TABLE 5.2 TRANSPORTATION ALTERNATIVES Cost ($1,000) NPV ($1,000) 2,000 3,000 1,500 2,200 4,000 5,000 3,000 4,300 Road between Augen and Burger 1 Concrete, 2 lanes 2 Concrete, 4 lanes 3 Asphalt, 2 lanes 4 Asphalt, 4 lanes Bridge at Cay Road 5 Repair existing 6 Add lane 7 New structure Traffic Control in Downsberg 8 Traffic lights 9 Turn lanes 10 Underpass 500 1,500 2,500 1,000 1,500 2,500 100 600 1,000 300 1,000 2,000 At most one project can be selected for each major objective

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Practical Financial Management

Authors: William R. Lasher

8th edition

1305637542, 978-1305887237, 1305887239, 978-1305637542

More Books

Students also viewed these Finance questions

Question

What is the difference between trust and trustworthiness?

Answered: 1 week ago