2. The total construction cost of a Ford car factory with a production capacity of 4000 cars/day in Detroit, MI, completed in year 2010
2. The total construction cost of a Ford car factory with a production capacity of 4000 cars/day in Detroit, MI, completed in year 2010 was $900 million. A proposed similar factory with a production capacity of 3500 cars/day is to be built in Tallahassee, FL, for completion in 2020. Moreover, the following data was obtained. Develop a parametric estimate for the total cost of the Tallahassee factory. For the Detroit factory, there was a work item of $8 million for site preparation, which is not typical for other similar factories. Special hurricane resistance work items will be done for the Tallahassee factory and they cost $12.5 million. . The cost capacity factor for these type of buildings x = 0.6 The inflation rate for the period from 2010 to 2020 is 2.5% per year. The location construction index was 1.4 for Detroit and 1.2 for Tallahassee in 2020. New air pollution equipment for the Tallahassee factory will cost $12.2 million in 2020 (that equipment was not required for Detroit). An increased contingency cost of 3% of total construction cost is expected for the Tallahassee factory due to expected rain delays. The new factory in Tallahassee will seek LEAD certification as a green building. The total predicted cost for the certification is 8% of the total cost. No green certification was required for the Detroit factory.
Step by Step Solution
★★★★★
3.50 Rating (153 Votes )
There are 3 Steps involved in it
Step: 1
ANS WER The total cost of the Tall ah as see factor...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started