Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

2. using plantwide rate, compute the unit product cost for each product unit production costs ( ex300 and tx500) 4. using activity rates compute the

image text in transcribed

2. using plantwide rate, compute the unit product cost for each product

unit production costs ( ex300 and tx500)

image text in transcribed

4. using activity rates compute the unit product costs for each product (ex300 and tx500)

Precision Manufacturing Inc. (PMI) makes two types of industrial component partsthe EX300 and the TX500. It annually produces 54,000 units of EX300 and 11,900 units of TX500. The company's conventional cost system allocates manufacturing overhead to products using a plantwide overhead rate and direct labor dollars as the allocation base. Additional information relating to the company's two product lines is shown below: Direct materials Direct labor EX300 $360,325 $114,000 TX500 $156,550 $ 39,500 Total $516,875 $153,500 The company is considering implementing an activity-based costing system that distributes all of its manufacturing overhead to four activities as shown below: Activity Activity Cost Pool (and Activity Measure) Machining (machine-hours) Setups (setup hours) Product-level (number of products) General factory (direct labor dollars) Total manufacturing overhead cost Manufacturing Overhead $ 179,375 96, 900 78,310 44,515 $ 399,100 EX300 84,000 45 1 $114,000 TX500 59,500 240 Total 143,500 285 2 $153,500 $39,500 Required: 1-a. Compute the plantwide overhead rate that would be used in the company's conventional cost system. 1-b. Using the plantwide rate, compute the unit product cost for each product. 2-a. Compute the activity rate for each activity cost pool. 2-b. Using the activity rates, compute the unit product cost for each product. Complete this question by entering your answers in the tabs below. Reg 1A Reg 1B Reg 2A Reg 2B Compute the plantwide overhead rate that would be used in the company's conventional cost system. (Round your answer to 2 decimal places.) Predetermined overhead rate per DLS Required: 1-a. Compute the plantwide overhead rate that would be used in the company's conventional cost system. 1-b. Using the plantwide rate, compute the unit product cost for each product. 2-a. Compute the activity rate for each activity cost pool. 2-b. Using the activity rates, compute the unit product cost for each product. Complete this question by entering your answers in the tabs below. Reg 1A Req 1B Reg 2A Req 2B Compute the activity rate for each activity cost pool. (Round your Machining and General factory activity rates to 2 decimal places.) Activity Cost Pools Machining Setups Product-level General factory Activity Rate per MHR per setup hr. per product per DLS

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction to Managerial Accounting

Authors: Peter Brewer, Ray Garrison, Eric Noreen

7th edition

978-1259675539, 125967553X, 978-1259594168, 1259594165, 78025796, 978-0078025792

More Books

Students also viewed these Accounting questions