2. You have been hired by electric bike manufacturer to analyze its production flows. The company needs to achieve desired daily output for the
2. You have been hired by electric bike manufacturer to analyze its production flows. The company needs to achieve desired daily output for the hub motor assembly line of 400 units. This assembly line will operate 600 minutes per day. Information needed to balance the assembly line includes: