Answered step by step
Verified Expert Solution
Question
1 Approved Answer
2.1. A contractor has decided to use project scheduling techniques for the construction of a building. The jobs he has to do are listed
2.1. A contractor has decided to use project scheduling techniques for the construction of a building. The jobs he has to do are listed in Table 2.1. (a) Draw the precedence constraints graph. (b) Compute the makespan of the project. (c) If it would be possible to shorten one of the jobs by one week, which job should be shortened? Job Description of Job Duration Immediate Predecessor(s) 1 Excavation 2 Foundations 4 weeks 2 weeks 1 3 Floor Joists 3 weeks 2 4 Exterior Plumbing 3 weeks 1 5 Floor 2 weeks 3,4 1 weeks 10 weeks 2 weeks 6 Power On 7 Walls 8 Wiring 9 Communication Lines 1 weeks 10 Inside Plumbing 5 6,7 8 5 weeks 7 11 Windows 2 weeks 10 12 Doors 2 weeks 10 9,10 12,13 13 Sheetrock 3 weeks 5 weeks 4 weeks 14 interior trim 15 exterior trim 12 16 Painting 17 Carpeting 18 Inspection 3 weeks 11,14,15 1 weeks 1 weeks 16 17 Table 2.1. Table for Exercise 2.1
Step by Step Solution
★★★★★
3.40 Rating (156 Votes )
There are 3 Steps involved in it
Step: 1
Answer Solution a we...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started