Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

2.5 Work breakdown structure (WBS) Instructions To remain on track, complete by the end of module six Refer to the assessment criteria Refer to your

image text in transcribed
2.5 Work breakdown structure (WBS) Instructions To remain on track, complete by the end of module six Refer to the assessment criteria Refer to your Component Analysis in which 20 activities were identified. Utilise these 20 Activities for the remainder of your assignment Resultant of your Risk Assessment, mitigation and or contingencies items should have been developed and included in your Component Analysis The WBS should show the following data as extracted from the Component Analysis: WBS number, Deliverables (Inclusions) and Activities The WBS does not show Exclusions, Assumptions or Risks Draw a WBS and insert it into this section If the outlay of the WBS is too large for an A4 page, insert an A3 page, or copy sections of the WBS on subsequent pages If the WBS is done in Excel, copy and paste your information into this section in either PDF format or as an image (do not insert links to other documents!)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Management Process

Authors: Lee Long

4th Edition

978-0201822939,0201822938

More Books

Students also viewed these General Management questions

Question

2. How have your life experiences encouraged you to make changes?

Answered: 1 week ago

Question

Show the properties and structure of allotropes of carbon.

Answered: 1 week ago