Question
3. A company PT. SE, a manufacturer of electrical equipment in the Cibitung - Bekasi area, will be supplied with power by PT. PLN uses
3. A company PT. SE, a manufacturer of electrical equipment in the Cibitung - Bekasi area, will be supplied with power by PT. PLN uses SKUTM TIC (MVTIC) 3 x 240 mm2 along 10 km. Power required 38 MVA / 20 kV, work factor 0.87. After being calculated based on the drawing from the planning consultant, the price is obtained: A. Materials and Services (Investment) 1. Material Rp. 5,429,540,000 2. Installation services + transportation costs Rp. 856,780,000 3. Others Rp. 758,680,000
B. Operating costs (maintenance costs + loss of kWh) / year IDR 369,100,000 It is assumed that the company after it operates will pay the electricity bill to PT. PLN of IDR 515,168,000 / month (includes expenses + usage fees and other costs). Determine: a. The number of support poles (concrete poles) needed if the distance between the poles (1 goal) is 50 meters b. The length of the SKUTM TIC conductor if the network is 3 phase 3 wire c. Single line diagram between PT feeders. PLN with the company (factory) d. In how many months the principal return point (BEP) will be obtained by PT. PLN to build the SKUTM network.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started