Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

3. An engineering company has presented three designs to improve traffic flow at a major intersection in a heavily traveled suburban area. The first alternative

image text in transcribed

3. An engineering company has presented three designs to improve traffic flow at a major intersection in a heavily traveled suburban area. The first alternative involves traffic signaling. The second alternative includes traffic signal improvement and intersection widening for exclusive left turns. The third alternative includes extensive reconstruction, including a grade separation structure. The construction costs, as well as annual maintenance and user costs are listed in the following table for each alternative. Determine which alternative is preferred based on the economic criteria if the analysis period is 20 years and the annual interest rate is 15 percent. Show that the result is the same using the present worth, equivalent annual cost, and the rate of return methods. Annual CapitalMaintenance Annual User Salvage Costs (S) | Costs Value(s), (5) 15,000 10,000 9,000 8,000 Alternative Costs (S) Present condition Traffic signals Intersection widening Grade separation 450,000 890,000 1,350,000 500,000 401,000 15,000 350,000 11,000 301,000

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Accounting A Comprehensive Guide For Beginners

Authors: Robert McCarthy

1st Edition

1638180474, 978-1638180470

More Books

Students also viewed these Accounting questions

Question

Does the duty to accommodate apply in this case?

Answered: 1 week ago