Question
3. Copperfield Mining Companyownstwo mines, each of which produces three grades of ore high, medium, andlow. Thecompany has a contract to supply a smelting company
3. Copperfield Mining Companyownstwo mines, each of which produces three grades of ore high, medium, andlow. Thecompany has a contract to supply a smelting company with at least 150tons ofhigh-grade ore, 120 tons of medium-grade ore, and 150 tons of low-gradeore.Each mine produces a certain amount of each type of ore during each hourthat itoperates. Mine 1 produces 6.5 tons of high-grade ore, 3.2 tons ofmedium-gradeore, and 4.8 tons of low grade ore per hour. Mine 2 produces 3.2,4.0, and 9.8tons, respectively, of high-, medium-, and low-grade ore per hour.It costsCopperfield $400 per hour to operate mine 1, and it costs $280 per hourtooperate mine 2. The company wants to determine the number of hours it needstooperate each mine so that its contractual obligations can be met at thelowestcost.
Formulate a linear programmingmodel for this problem.
Note: Do NOT solve the modelafter formulating.
4. Determine whether thefollowinglinear programming problem is infeasible, unbounded, or has multipleoptimalsolutions. Draw a graph and explain your conclusion.
Maximize 80x + 60y
Subjectto
-3x + 4y< 60
2x + 3y> 60
2x + y >40
x, y 0
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started