3. For a project with conventional cash flows, if its IRR is greater than the cost of capital, then the NPV is: O positive zero
3. For a project with conventional cash flows, if its IRR is greater than the cost of capital, then the NPV is: O positive zero negative the sign of the NPV can't be determined without the actual cash flows