Question
3.1 Partial Control Matrix: include at least 7 existing control plans and any (missing) control plans for each subsystem examined. These control plans should relate
3.1 Partial Control Matrix: include at least 7 existing control plans and any ("missing") control plans for each subsystem examined. These control plans should relate to the "key" or "main" objectives of each of the relevant parts of the client's subsystem under review. As the case study will have some necessary constraints that will prevent you designing a perfect system, you will need to identify control weaknesses and inefficiencies inherent in your design and what recommendations or design changes you would suggest to improve the efficiency and effectiveness of the AIS, if some or all of the constraints are reduced. Please bring graph of control gaols of the OES process.
Control Matrix Explanation: Describe how each control plan helps (or would help) achieve system goals.
Control Matrix Explanation: Describe how each control plan helps (or would help) achieve system goals. Control Analysis: Discuss the overall adequacy of controls used in each subsystem under review. Discuss the efficiency and effectiveness of controls (if an operations or information system goal has no plan listed under it on your matrix, why not? Does an expensive control support a single goal? Is this appropriate, in your judgment? Are there control deficiencies in your system design due to cost effect constraints, software incompatibility with your preferred system etc.? If so why is this appropriate, in your judgment? Discuss the mix of preventive, detective, and corrective controls. Form a conclusion as to the quality of the controls, based on the system's environment and user needs. Managerial Recommendations for each subsystem under review: Go beyond a narrow control view to a broader look at how well the system achieves organisational goals, and how it might be incrementally or dramatically reengineered (e.g. by taking advantage of new technologies) to better achieve organisational goals, in the future. If you recommend changes to your current system design and procedures, prepare draft of the new procedure(s), and document how the system would change, using a data flow diagram or flow chart. If you recommend a new report, prepare draft of that report. If you recommend purchase of new hardware or a new software package, indicate either a specific product recommendation, or list several viable options. If you recommend the status quo, justify your recommendation. This segment will complement the discussion of missing controls in part 3.1.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started