Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

38% .. CLARO LT QUESTION 26 1. In a farol system, check printing and the Overtime Report are examples of the following system element: A.

image text in transcribed
38% .. CLARO LT QUESTION 26 1. In a farol system, check printing and the Overtime Report are examples of the following system element: A. "output" B. "input" C. storage D. memory QUESTION 27 1. The Development Life Cycle of an SDLC" System consists of the following three phases: A requirements, design and implementation B. definition, construction and implementation C. specifications, development and installation D. feasibility analysis, testing and maintenance QUESTION 28 1. The conversion strategy for the implementation of an Information Systems project where the new system is implemented in part of the organization and after the necessary tests it is implemented in the rest of the organization, is known as: A. parallel B. by phases C. "cutover or direct D. pilot project QUESTION 29 1. The programming tools that automate some or all phases of the Development Life Cycle of an "SDLC" System are called: A. RAD B. JAD C. CASE D. DRS QUESTION 30 1. The conversion strategy for the implementation of an Information Systems project where the new system is implemented while the old one is in operation (until the new system is debugged), is known as: A. parallel B. pilot project C. by phases D. "cutover" or direct QUESTION 311. The characteristic that best describes the "cutover" or direct conversion strategy is: A. safe B. stable C. risky D. none of the above QUESTION 32 1. In the Development Life Cycle of an "SDLC System, the testing stage is part of the phase of: A. maintenance B. construction C. implantation D. installation QUESTION 33 1. The conversion strategy for the implementation of an Information Systems project where the old system is discarded giving way to the new system, is known as: A parallel B. by phases C. pilot project D. "cutover" or direct QUESTION 34 1. RAD, a methodology that combines prototypes with "Joint Application Design" (AD) and integrated "I-CASE" tools to rapidly produce high-quality systems, means A. "Reengineered Advanced Development" B. "Rapid Analytical Design C. "Reengineered Application Design" D. "Rapid Application Development QUESTION 35 1. Which component belongs to project planning? A. "project scheduling" B. "project budgeting" C. "project staffing" D. All of the above. 38% .. CLARO LT QUESTION 26 1. In a farol system, check printing and the Overtime Report are examples of the following system element: A. "output" B. "input" C. storage D. memory QUESTION 27 1. The Development Life Cycle of an SDLC" System consists of the following three phases: A requirements, design and implementation B. definition, construction and implementation C. specifications, development and installation D. feasibility analysis, testing and maintenance QUESTION 28 1. The conversion strategy for the implementation of an Information Systems project where the new system is implemented in part of the organization and after the necessary tests it is implemented in the rest of the organization, is known as: A. parallel B. by phases C. "cutover or direct D. pilot project QUESTION 29 1. The programming tools that automate some or all phases of the Development Life Cycle of an "SDLC" System are called: A. RAD B. JAD C. CASE D. DRS QUESTION 30 1. The conversion strategy for the implementation of an Information Systems project where the new system is implemented while the old one is in operation (until the new system is debugged), is known as: A. parallel B. pilot project C. by phases D. "cutover" or direct QUESTION 311. The characteristic that best describes the "cutover" or direct conversion strategy is: A. safe B. stable C. risky D. none of the above QUESTION 32 1. In the Development Life Cycle of an "SDLC System, the testing stage is part of the phase of: A. maintenance B. construction C. implantation D. installation QUESTION 33 1. The conversion strategy for the implementation of an Information Systems project where the old system is discarded giving way to the new system, is known as: A parallel B. by phases C. pilot project D. "cutover" or direct QUESTION 34 1. RAD, a methodology that combines prototypes with "Joint Application Design" (AD) and integrated "I-CASE" tools to rapidly produce high-quality systems, means A. "Reengineered Advanced Development" B. "Rapid Analytical Design C. "Reengineered Application Design" D. "Rapid Application Development QUESTION 35 1. Which component belongs to project planning? A. "project scheduling" B. "project budgeting" C. "project staffing" D. All of the above

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Structure Of The Relational Database Model

Authors: Jan Paredaens ,Paul De Bra ,Marc Gyssens ,Dirk Van Gucht

1st Edition

3642699588, 978-3642699580

More Books

Students also viewed these Databases questions

Question

8. Managers are not trained to be innovation leaders.

Answered: 1 week ago