Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

4 (20 Marks) 4.1 REQUIRED Study the information given below and calculate the following, if the proposal is accepted: 4.1.1 Break-even quantity. (4 marks) 4.1.2

  1. 4 (20 Marks)

4.1

REQUIRED

Study the information given below and calculate the following, if the proposal is accepted:

4.1.1

Break-even quantity.

(4 marks)

4.1.2

The number of litres of diesel that must be sold to achieve a profit of R300 000 per month.

(4 marks)

INFORMATION

The output of a project of GHJ Limited is diesel. The diesel is sold at R17.60 per litre and the variable costs total R14 per litre. The fixed costs per month are R272 400. After six months of commencing the project, the sales achieved was 1 075 260 litres and the sales were more or less the same volume each month. In an

attempt to improve performance, the project manager is considering the following proposal:

Customers (Service stations) will be allowed to purchase diesel on credit. It is estimated that 50% of the average monthly sales (in litres) will be to customers who would take advantage of this opportunity. Sales to these customers should increase by 20%. Sales volumes to customers who do not take advantage of the

credit policy are expected to remain unchanged. Additional costs arising from this proposal are expected to be:

  • Selling costs of R0.60 per litre.
  • Fixed administrative costs of R15 000 per month.

4.2

REQUIRED

Study the information provided below and answer the following questions:

4.2.1

Calculate the activity cost rates using activity-based costing (ABC).

(6 marks)

4.2.2

Calculate the total overheads cost per product using the ABC system.

(4 marks)

INFORMATION

Salsa Ltd manufactures two products, viz. Product M and Product N. The enterprise intends implementing the Activity-Based Costing (ABC) system. The budgeted information for 2021 is as follows:

R

Total overheads:

4 500 000

Machine set-ups

300 000

Design costs

900 000

Other overheads

3 300 000

Product M

Product N

Total

Units manufactured

1 500 units

13 500 units

15 000 units

Machine set-ups

150 set ups

150 set ups

300 set ups

Design hours

6 000 hours

24 000 hours

30 000 hours

Direct labour hours

12 000 hours

48 000 hours

60 000 hours

Other overheads are allocated to individual products on the basis of direct labour hours

4.3

An order obtained was received for the supply of a product which is made at a project of

VBN Limited. The material cost of making the product for the order is R20 000. Only 25%

of the primary material for the product is available in stock. The material was purchased a

year ago for R6 000. If the material is not used it will be scrapped at a price of R2 000.

The remaining material has to be purchased at a cost of R14 000.

How much is the total relevant cost of the material?

(2 marks)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Pioneers Of Critical Accounting A Celebration Of The Life Of Tony Lowe

Authors: Jim Haslam, Prem Sikka

1st Edition

113754211X, 9781137542113

More Books

Students also viewed these Accounting questions

Question

What can Chandra do to correct her mistake?

Answered: 1 week ago