Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

4. Consider the tables below. Table 1 includes information about the fixed cost of four generating technologies, Table 2 contains information about the variable costs

image text in transcribed
4. Consider the tables below. Table 1 includes information about the fixed cost of four generating technologies, Table 2 contains information about the variable costs of the same units, and Table 3 contains information about the technical parameters of these units. Please note that CCGT stands for Combined Cycle Gas Turbine OCGT stands for Open Cycle Gas Turbine, O&M stands for Operation and Maintenance. and WACC stands for the weighted average cost of capital Table 1: Fixed Costs of Thermal Power Plants Unit Technology Capital Cost Life WACC Fixed O&M Cost Annualized [KS/MWI [yeats) 19 IS/MW-year) Capital Cost R$MW year) 1 Nuclear 5.333 40 7 8.750 489 2 Coal 3.167 40 10 35970 360 3 CCGT 978 20 10 14,390 129 4 974 40 10 6980 106 Variable Costs of Thermal Power Plants Unit Technology Variable O&M Cost Healt Fuel price Variable Cost [S/MWh [MBTU MWh) [S/MBTUJ (S/MWh] 1 Nuclear 2.04 10.49 0.43 65 2 Coal 4.25 88 2.22 23.8 3 CCGT 705 7.81 585 4 14.7 10.85 781 99.4 Minimum up time [hr] Technical parameters of these units. Unit Technology Pimax Pimin Maximum Start-up costs Minimum [GW] (GW) ramp [MS start-up down time [GW 1 Nuclear 1 0.03 1 20 2 Coal 0.5 0.1 021 0.05 6 3 COGT 0.4 0.32 0.02 3 4 OCGT 03 0.15 0.36 0.004 0 20 6 0.1 3 0 Answer the following questions: 2. If the demand at 1pm is 12 GW.Formulate the Economics Dispatch (EC) problem. Consider all the relevant constraints. Make sure to define all variables and parameters in your problem b. If the demand at 1pm is 12 GW. What is the solution to the Economic dispatch problem? 4. Consider the tables below. Table 1 includes information about the fixed cost of four generating technologies, Table 2 contains information about the variable costs of the same units, and Table 3 contains information about the technical parameters of these units. Please note that CCGT stands for Combined Cycle Gas Turbine OCGT stands for Open Cycle Gas Turbine, O&M stands for Operation and Maintenance. and WACC stands for the weighted average cost of capital Table 1: Fixed Costs of Thermal Power Plants Unit Technology Capital Cost Life WACC Fixed O&M Cost Annualized [KS/MWI [yeats) 19 IS/MW-year) Capital Cost R$MW year) 1 Nuclear 5.333 40 7 8.750 489 2 Coal 3.167 40 10 35970 360 3 CCGT 978 20 10 14,390 129 4 974 40 10 6980 106 Variable Costs of Thermal Power Plants Unit Technology Variable O&M Cost Healt Fuel price Variable Cost [S/MWh [MBTU MWh) [S/MBTUJ (S/MWh] 1 Nuclear 2.04 10.49 0.43 65 2 Coal 4.25 88 2.22 23.8 3 CCGT 705 7.81 585 4 14.7 10.85 781 99.4 Minimum up time [hr] Technical parameters of these units. Unit Technology Pimax Pimin Maximum Start-up costs Minimum [GW] (GW) ramp [MS start-up down time [GW 1 Nuclear 1 0.03 1 20 2 Coal 0.5 0.1 021 0.05 6 3 COGT 0.4 0.32 0.02 3 4 OCGT 03 0.15 0.36 0.004 0 20 6 0.1 3 0 Answer the following questions: 2. If the demand at 1pm is 12 GW.Formulate the Economics Dispatch (EC) problem. Consider all the relevant constraints. Make sure to define all variables and parameters in your problem b. If the demand at 1pm is 12 GW. What is the solution to the Economic dispatch

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

All About Options

Authors: Thomas McCafferty

3rd Edition

0071484795, 978-0071484794

More Books

Students also viewed these Finance questions