Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

417. Spoiled & Defective Production. A job order calling for 50 motors was sent through the factory. The cost elements per motor were: Materials Rs.110

image text in transcribed
417. Spoiled & Defective Production. A job order calling for 50 motors was sent through the factory. The cost elements per motor were: Materials Rs.110 Labour Rs. 175 Predetermined Factory overhead Rs.125 After the motors had been manufactured, final inspection discovered that 2 motors were spoiled and would have to be sold as seconds at a price of Rs.100 each, whereas, one motor was defective which would require Rs.50 of additional materials, and Rs.50 and Rs.25of aditional labour and factory overhead. Required: Prepare journal entries: 1. When the loss is charged to specific job. 2. When the loss is not so charged. Check figures: (1) Cost of finished goods Rs.20,425 (2) Cost of spoilage Rs.620, Cost of finished goods Rs.19,680

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Financial Accounting

Authors: CHARLES T. HORNGREN AND ET ALL.

11th Edition

9352862473, 978-9352862474

More Books

Students also viewed these Accounting questions