Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

4th picture posted shows how to do the case study, please help me with that Case Study: Will Win, Director, Quality Assurance Will Win was

image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
4th picture posted shows how to do the case study, please help me with that
Case Study: Will Win, Director, Quality Assurance Will Win was whistling as he walked toward his office, still feeling a bit like a stranger since he had been hired four wecks ago as director, quality assurance. All last week he had been away from the plant at an interesting seminar entitled "Quality in the 2020' " g given for quality managers of manufacturing plants by the corporate training department. He was not looking forward to really digging into the quality problem at this industrial products plant employing 1967 people. Will poked his head into Rob Robert's office, his immediate subordinate, the quality control manager, and asked him how things had gone last week. Rob's muted smile and an "Oh fine" stopped Will in his tracks. He did not know Rob very well and was unsure of how to start building his relationship with him since Rob had been passed over for the promotion of Will's job - Rob's evaluation form had stated "superb technical knowledge; managerial skills lacking." Will decided to inquire a little further into what had happened. Rob replied: Oh, just another typical quality snafu. We had little problem on the Greasex line last week (a specialized degreasing solvent packed in a spray can for the high-technology sector). A little high pressure was found on some of the cans on the second shift, but a supervisor vented them out so that we could ship them out. We met our delivery schedule! Since Will was still relatively unfamiliar with the plant and the products, he asked Rob to elaborate. Painfully, Rob continued: We've been having some trouble with the new filling equipment, and some of the cans were pressurized beyond our acceptable standard on a psi (pounds per square inch) rating scale. The production rate is still 50 percent of standard, about 14 cases per shift, and we caught it halfway into the shift. Cody Cook (the inspector for that line) picked it up, tagged the cases "Hold" and went on about his duties. When he returned at the end of the shift to write up the rejects, Mat Mason, first-line supervisor, was by a pallet of finished goods finishing sealing up a carton of the rejected Greasex: the reject "Hold" tags had been removed. He told Cody Cook that he had heard about the high pressure from another inspector at the coffee break, had come back, taken off the tags, individually turned the cans upside down and vented every one of them in the rejected eight cartons. He told Cody Cook that production planning was really pushing for the stuff, and that they couldn't delay by having it sent through the rework area. He told Cody Cook that he would get on the operator to run the equipment right next time. Cody Cook didn't write it up but came in about three days ago to tell me about it. Oh, it happens every once in a while, and I told him to make sure to check with maintenance to make sure the filling machine was adjusted; and I saw Mat in the hall and told him that he ought to send the stuff through rework next time. The incident had oceurred a week ago: the goods were probably out in tis to be more pressing now; everyone had forgotten about it (or wanted tol); and there seemed to be mag at him. He felt problems than this for Will to spend his time on. However, this continued to nagat like a personal slap like the quality department was being treated as a joke, and it also felt to him like a personale but what could he do? He was troubled enough to cancel his appointments and spend the mollowing: for the filling equipment had just been transferred from A. From personnel - The operator for the filling equipment had just becu transferted in by tromal training in tob but was being trained shipping two wecks ago. He had no formal training in this job but was bcing the high pressure Mat on the job, to run the equipment. When Cody Cook had tested the high rejected material cans, the operator was nowhere to ber after the shift was over. from Mat af B. From plant maintenance - This particular piece of automated filling equipment had been purchased two years ago for use on another product. It had been switched to the Greasex line six months ago, and maintenance had 13 work orders during the last months for repairs or adjustments on it. The equipment had been adapted by plant maintenance for handling the lower viscosity Greasex, which it had not originally been designed for. This included designing a special filling bead. There was no scheduled preventative maintenance for this equipment, and the parts for the sensitive filling head, replaced three times in the last six months, had to be made at a nearby machine shop. Nonstandard downtime was running at 19% of actual running times. C. From purchasing - The plastic nozzle heads for the Greasex can, recently designed by a vendor for this new product on a rush order, were often found with slight burrs on the inside rim, and this caused some trouble in fitting the top to the can. An increase in application pressure at the filling head by maintenance adjustment had solved the burr application problem or had at least "forced" the nomle heads on despite the burrs. Purchasing said that they were going to talk to the sales representative of the nozzle supplier about this next time they came in. D. From product design and packaging - The can, designed especially for Greasex, had been contoured to allow better gripping by the user. This change, instigated by marketing research, set Greasex apart from the appearance of its competitors and was seen by the designers to be "significant." There had been no test of the effects of the contoured can on filling speed or filling hydrodynamies from a high-pressured filling head. Will had a hunch that the new design, was acting as a venturi when being filled, but the packaging designer thought that "unlikely.". F. From the manufacturing manager-He had heard about the problem: in fact, Mat: had made a joke about it, bragging about how he beat his production quota to the other foremen and shift supervisors. Mat was thought of by the manufacturing manager to be one of the "best foremen we have... he always gets his production out." His promotion papers were actually on the manufacturing manager's desk when Will dropped by. Mnt was being "strongly considered" for promotion to shift supervisor. The manufacturing manager, under pressure from Mr. Power for cost improvements and reduced delivery times, sympathized with Will but said that the rework area would have just vented with their pressure gauges what Mat did by hand. "But, ['ll speak with Mat about the incident." F. From Marketing - The introduction of Greasex had been rushed to beat competitors to market and a major promotional / advertising campaign was now underway to increase consumer awareness. A deluge of orders is swamping the order-taking department and putting Greasex high on the back-order list. Production "had to tum the stuff out." Even a little off spec was tolerable becatse "it would be better to have it on the shelf than not there at all. Who cares if the label is a litile crooked or the stuff comes out with a little too much pressure? We need market share now in that high-tech segment." What bothered Will the most was the safety issue of the high-pressure in the cans. He had no way of knowing how much of a liazard the high pressure was or if Mat had vented them enough to effectively reduce the hazard. The data from the can manufacturer which Rob had showed him indicated that the high pressure which the inspector had found was not in the danger area; but then again the inspector had only used a sample testing procedure to rejoct the eight cases. Even if he could morally accept that there was no product safety hazard, could he make sure that this never happened again? Will, skipping lunch, sat in his office and thought about the morning's events. Last week's seminar had talked about "the role of quality". "productivity and quality", "creating a new attitude", and the "quality challenge", but where had they told him what to do when this happens? He had left a very good job to come here becatse he thought the company was serious about the importance or quality, and he wanted a challenge. Will demanded and received salary equal to the manufacturing, marketing and R\&D directors' and reported directly to the General Manager. Yet. he still did not know exactly what he should or should not do or even what be could or could not do. Provocative questions to help get you started: 1. What is wrong with the way quality is managed in this company? 2. What should be done to improve quality management? 3. What should Will Win do? Page 3 of 3 Table of Contents: Case Study (Sample 2) 1.0 Introduction 2.0 Issues with Quality Management and Analysis 2.1 Personnel 2.2 Plant Maintenance 2.3 Purchasing Department 2.4 Product Design \& Packaging Department 2.5 Manufacturing Manger 2.6 Marketing Department 3.0 Recommendations 3.1Short-Term Recommendations 3.1.1 Personnel 3.1.2 Plant Maintenance 3.1.3 Purchasing Department 3.1.4 Product Design \& Packaging Department 3.1.5 Manufacturing Manger 3.1.6 Marketing Department 3.2 Long-Term Bibliography/References Appendix A

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Business Analytics Methods Models And Decisions

Authors: James R. Evans

2nd Edition

321997824, 978-1119298588, 978-0321997821

More Books

Students also viewed these General Management questions