5. A project involving the installation of a computer system consists of eight activities as shown in the activity table below: Activity Immediate Predecessor Time
5.
A project involving the installation of a computer system consists of eight activities as shown in the activity table below:
|
5.1. Draw the PERT network for this project. [14]
5.2. Identify the critical path. [02]
5.3. What is the expected completion time for the project? [02]
5.4. Identify three activities that can be delayed and for each, determine the slack. [03]