Answered step by step
Verified Expert Solution
Question
1 Approved Answer
5. For a manufacturing plant, the bill of labor at critical work centers and the master production schedule, by quarter, for the next year are
5. For a manufacturing plant, the bill of labor at critical work centers and the master production schedule, by quarter, for the next year are as follows: Bill of Labor (hours per unit) Work Center Part A Part B WC 1 2.3 3.2 WC 2 3.7 3.4 WC 3 6.4 7.1 Master Schedule (units) for Parts A and B Quarter 2 3 4 Part A 1,800 2.250 2.400 2,300 Part B 2,400 1.900 1,450 2,900 (a) Using the bill of labor approach, determine the number of hours required in the work centers for each quarter. Assume that the times just obtained are completely accurate and that only these three work centers exist in the plant. Determine the factors that would be used by Capacity Planning Using Overall factors (CPOF) to prorate total plant time. Page 213 (6) Assume that the work for Part A at WC 1 must be done one quarter prior to the other two operations and that the work for Part A at WC 2 must be done one quarter prior to the other two operations. Create the appropriate resource profile and the rough cut capacity plan that would result. 5. For a manufacturing plant, the bill of labor at critical work centers and the master production schedule, by quarter, for the next year are as follows: Bill of Labor (hours per unit) Work Center Part A Part B WC 1 2.3 3.2 WC 2 3.7 3.4 WC 3 6.4 7.1 Master Schedule (units) for Parts A and B Quarter 2 3 4 Part A 1,800 2.250 2.400 2,300 Part B 2,400 1.900 1,450 2,900 (a) Using the bill of labor approach, determine the number of hours required in the work centers for each quarter. Assume that the times just obtained are completely accurate and that only these three work centers exist in the plant. Determine the factors that would be used by Capacity Planning Using Overall factors (CPOF) to prorate total plant time. Page 213 (6) Assume that the work for Part A at WC 1 must be done one quarter prior to the other two operations and that the work for Part A at WC 2 must be done one quarter prior to the other two operations. Create the appropriate resource profile and the rough cut capacity plan that would result
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started