Question

1 Approved Answer

5. For a manufacturing plant, the bill of labor at critical work centers and the master production schedule, by quarter, for the next year are

image text in transcribed

5. For a manufacturing plant, the bill of labor at critical work centers and the master production schedule, by quarter, for the next year are as follows: Bill of Labor (hours per unit) Work Center Part A Part B WC 1 2.3 3.2 WC 2 3.7 3.4 WC 3 6.4 7.1 Master Schedule (units) for Parts A and B Quarter 2 3 4 Part A 1,800 2.250 2.400 2,300 Part B 2,400 1.900 1,450 2,900 (a) Using the bill of labor approach, determine the number of hours required in the work centers for each quarter. Assume that the times just obtained are completely accurate and that only these three work centers exist in the plant. Determine the factors that would be used by Capacity Planning Using Overall factors (CPOF) to prorate total plant time. Page 213 (6) Assume that the work for Part A at WC 1 must be done one quarter prior to the other two operations and that the work for Part A at WC 2 must be done one quarter prior to the other two operations. Create the appropriate resource profile and the rough cut capacity plan that would result. 5. For a manufacturing plant, the bill of labor at critical work centers and the master production schedule, by quarter, for the next year are as follows: Bill of Labor (hours per unit) Work Center Part A Part B WC 1 2.3 3.2 WC 2 3.7 3.4 WC 3 6.4 7.1 Master Schedule (units) for Parts A and B Quarter 2 3 4 Part A 1,800 2.250 2.400 2,300 Part B 2,400 1.900 1,450 2,900 (a) Using the bill of labor approach, determine the number of hours required in the work centers for each quarter. Assume that the times just obtained are completely accurate and that only these three work centers exist in the plant. Determine the factors that would be used by Capacity Planning Using Overall factors (CPOF) to prorate total plant time. Page 213 (6) Assume that the work for Part A at WC 1 must be done one quarter prior to the other two operations and that the work for Part A at WC 2 must be done one quarter prior to the other two operations. Create the appropriate resource profile and the rough cut capacity plan that would result

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

A Concise History Of International Finance From Babylon To Bernanke

Authors: Larry Neal

1st Edition

1107621216, 978-1107621213

More Books

Students also viewed these Finance questions