6. The Town of Spooksville is installing a new watermain. The contractor has submitted their disinfection proposal for you to review. The watermain is 300

image text in transcribed

6. The Town of Spooksville is installing a new watermain. The contractor has submitted their disinfection proposal for you to review. The watermain is 300 mm in diameter and 1950 m long and the contractor is using a 15% bleach solution for disinfecting the pipe (starting at the beginning) a) Draw a sketch (2 marks) b) How long before the bleach solution makes its way to the end of the pipe if the flow leaving through the end bleeder is 500 L/min (4 marks) c) The contractor's plan says they will add 120 L of the bleach solution. Comment on this proposal assuming the final concentration for disinfecting the pipe according to regulations is 25 mg/L (4 marks) d) This is a long pipe- how frequently are you supposed to have bleeders (what is the maximum length of pipe to be done in sections)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Separation Of Molecules Macromolecules And Particles Principles Phenomena And Processes

Authors: Kamalesh K. Sirkar

1st Edition

0521895731, 9780521895736

More Books

Students also viewed these Chemical Engineering questions