Question
6.4. An order for 50 of a products is processed on work centers A and B. The setup time on A is 45 minutes, and
6.4. An order for 50 of a products is processed on work centers A and B. The setup time on A is 45 minutes, and run time is 5 minutes per piece. The setup time on B is 30 minutes, and the run time is 4 minutes per piece. Wait time between the two operations is 8 hours. The move time between A and B is 60 minutes. Wait time after operation B is 8 hours, and the move time into stores is 2 hours. Queue at work center A is 40 hours and at B is 35 hours. Calculate the total manufacturing lead time for the order.
6.7. International Door Slammers has an order to deliver 500 door slammers on day 130. Draw up a backward schedule under the following conditions:
Only one machine is assigned to each operation.
Schedule one 8-hour shift per day for 5 days per week.
All parts are to move in one lot of 500 pieces.
Allow 8 hours between operations for queue and move times.
A slammer consists of three parts. Purchased components C and D form subassembly A. Subassembly A and component B form the final assembly. Part B is machined in three operations. No special tooling is required except for part B, operation 20. It takes 24 hours to make the tooling. Material is available for all parts.
Standard times for the lot of 500 are as follows:
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started