7.4 Construct the required CFD and calculate life-cycle cost (LCC) at an interest rate of 8% per year for a proposed project, where the following table indicates cost categories (in millions) for the 20-year life cycle: 3 4 5 thru 20 10 Costin Each Yesss Milions) Cost Category 1 2 5 100 System Design $ 210 5 120 5 Software Design 0605 Hardwwe Purchase 5 Test 3 0 10 9 Lars Moral Development 5 0 105 System Implementation For Tarvy Tres 5 Software Upgrades 30 090 510 0.20 0.10 5 0 20 5 0 2DS $ 1.30 500 040 30.00 320 030 $ 2.50 $2.505 5 con 00 0005 2005 260 3 4 N 5 6 thru 20 10 18 Cost in Each Year(s) in (5 Millions) Cost Category 1 Field Study S 1.80 System Design s 210 s 1.20 s Software Design S 0.00 $ Hardware Purchases S Beta Testing s 0.10 $ User's Manual Development s 0.10 $ System Implementation Field Hardware $ Training Trainers $ Software Upgrades 0.50 0.90 5.10 0.20 0.10 0.08 $ 0.20 $ 1.30 $ 6.00 $ 2.50 0.40 0.30 s 0.20 $ $ 0.70 S 2.90 $ 2.50 S $ 0.70 0.80 S 3.00 S 260 7.4 Construct the required CFD and calculate life-cycle cost (LCC) at an interest rate of 8% per year for a proposed project, where the following table indicates cost categories (in millions) for the 20-year life cycle: 3 4 5 thru 20 10 Costin Each Yesss Milions) Cost Category 1 2 5 100 System Design $ 210 5 120 5 Software Design 0605 Hardwwe Purchase 5 Test 3 0 10 9 Lars Moral Development 5 0 105 System Implementation For Tarvy Tres 5 Software Upgrades 30 090 510 0.20 0.10 5 0 20 5 0 2DS $ 1.30 500 040 30.00 320 030 $ 2.50 $2.505 5 con 00 0005 2005 260 3 4 N 5 6 thru 20 10 18 Cost in Each Year(s) in (5 Millions) Cost Category 1 Field Study S 1.80 System Design s 210 s 1.20 s Software Design S 0.00 $ Hardware Purchases S Beta Testing s 0.10 $ User's Manual Development s 0.10 $ System Implementation Field Hardware $ Training Trainers $ Software Upgrades 0.50 0.90 5.10 0.20 0.10 0.08 $ 0.20 $ 1.30 $ 6.00 $ 2.50 0.40 0.30 s 0.20 $ $ 0.70 S 2.90 $ 2.50 S $ 0.70 0.80 S 3.00 S 260