Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

9 . 7 . Dye for our new line of blue jeans is being blended in a mixing tank. The desired color of blue is

9.7. Dye for our new line of blue jeans is being blended in a mixing tank. The desired color of blue
is produced using a concentration of 1500ppm blue dye, with a minimum acceptable con-
centration of 1400ppm. At 9 A.M. today the dye injector plugged, and the dye flow was inter-
rupted for 10min, until we realized the problem and unclogged the nozzle. see Fig. P9-7.
FIGURE P9-7
Plot the controller ouput from 9 A.M. to 9:10 A.M. The steady-state controller output (the bias
value) is 8g. Does the controller output saturate (output range is 3 to 15g)? If so, at what
time does it occur? The controller is a PI controller with Kc=0.001gppm and I=1min.
image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Chemical Engineering Tools For Today And Tomorrow

Authors: Kenneth A. Solen, John N. Harb

5th Edition

0470885726, 978-0470885727

More Books

Students also viewed these Chemical Engineering questions