#9 Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for
#9
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 74,000 units of product were as follows:
Standard Costs | Actual Costs | ||
Direct materials | 185,000 lbs. at $5.20 | 183,200 lbs. at $5.10 | |
Direct labor | 18,500 hrs. at $16.90 | 18,930 hrs. at $17.30 | |
Factory overhead | Rates per direct labor hr., | ||
based on 100% of normal | |||
capacity of 19,310 direct | |||
labor hrs.: | |||
Variable cost, $3.00 | $54,950 variable cost | ||
Fixed cost, $4.70 | $90,757 fixed cost |
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct Material Price Variance | $ | Favorable |
Direct Materials Quantity Variance | $ | Favorable |
Total Direct Materials Cost Variance | $ | Favorable |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct Labor Rate Variance | $ | Unfavorable |
Direct Labor Time Variance | $ | Unfavorable |
Total Direct Labor Cost Variance | $ | Unfavorable |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Variable factory overhead controllable variance | $ | Favorable |
Fixed factory overhead volume variance | $ | Unfavorable |
Total factory overhead cost variance | $ | Unfavorable |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started