Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round all intermediate calculations to 2 decimal places.)

9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round all intermediate calculations to 2 decimal places.)

10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?

11. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal place.)

12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal places.)

13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal places.)

14. Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and Product Z?

15. Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal place.)

image text in transcribed

! Required information [The following information applies to the questions displayed below.) Hickory Company manufactures two products13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all $729,000 of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Product design General factory Activity Measure Machine-hours Number of setups Number of products Direct labor-hours Estimated Overhead Cost $ 231,600 $ 55,900 $ 77,000 $ 364,500 Expected Activity 12,000 MHs 130 setups 2 products 14,400 DLHs Activity Measure Machine-hours Number of setups Number of products Direct labor-hours Product Y 6,300 40 1 9,000 Product Z 5,700 90 1 5,400

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Principles Of Food Beverage And Labor Cost Controls

Authors: Paul R. Dittmer, J. Desmond Keefe III

9th Edition

0471783471, 978-0471783473

More Books

Students also viewed these Accounting questions