A 1 5 MW geothermal power plant is being considered at a site where geothermal water at 2 5 0 C ( Degree Celcius )

A 15MW geothermal power plant is being considered at a site where geothermal water at 250 C (Degree Celcius) is available. Geothermal water is to be flashed into a chamber to a lower pressure where part of the water evaporates. The liquid is returned to the ground while the vapor is used to drive the steam turbine. The pressures at the turbine inlet and the turbine exit are to remain above 150 kPa and 8 kPa, respectively. High pressure flash chambers yield a small amount of steam with high exergy whereas lower-pressure flash chambers yield considerably more steam but at a lower exergy. By trying several pressures, determine the optimum pressure of the flash chamber to maximize the power production per unit mass flow rate of geothermal water withdrawn. For each pressure, design the Rankine cycle and determine the thermal efficiency assuming 15 percent of the power produced is used to drive the pumps and other auxiliary equipment. Plot results against the pressure of flash chambers

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Essentials of Materials Science and Engineering

Authors: Donald R. Askeland, Wendelin J. Wright

3rd edition

978-1111576868, 1111576866, 978-1285677620, 1285677625, 978-1111576851

More Books

Students also viewed these Mechanical Engineering questions

Question

Name and summarize the goals of compensation professionals.

Answered: 1 week ago