A 50-mgpd (US) water treatment plant is proposed in 2020 for Washington. A 60-mgpd plant using the same treatment process was built in 2013

 

A 50-mgpd (US) water treatment plant is proposed in 2020 for Washington. A 60-mgpd plant using the same treatment process was built in 2013 in Vancouver. Make a conceptual cost estimate based on the following information: Poor site condition in Vancouver required an additional $3,000,000 for foundation which is not anticipated for Washington. Assume the size exponent m- 0.67 Assume inflation will persist at an average of 4% per annum. Assume the location index for Vancouver is 1.17 and 1.24 for Washington A new High pressure filter process will be added at Washington at an additional cost of $4,000,000. The construction period for the new plant will be in Winter. Assume an increase of construction cost by 12%.

Step by Step Solution

3.46 Rating (153 Votes )

There are 3 Steps involved in it

Step: 1

in 201 3 in van co uver Given that A 50mgpd us water treatment plant in 2020 for ... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Engineering Economy

Authors: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling

15th edition

132554909, 978-0132554909

More Books

Students also viewed these Finance questions

Question

What do you mean by dual mode operation?

Answered: 1 week ago

Question

Explain the difference between `==` and `===` in JavaScript.

Answered: 1 week ago

Question

1. Research is asking questions and finding answers.

Answered: 1 week ago