A 55,000 kW thermal power plant of NPC delivers an annual output of 283,000 MWHr with a peak load of 44 MW. The annual load

A 55,000 kW thermal power plant of NPC delivers an annual output of 283,000 MWHr with a peak load of 44 MW. The annual load factor of the plant is nearest to?