Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A bulb production line's voltages are monitored by control charts, with a Phase 1 control chart of sum sigma x i = 361.5 & sum

A bulb production line's voltages are monitored by control charts, with a Phase 1 control chart of sum sigma xi = 361.5 & sum sigma Ri = 6.72, with n=4.

 

i) Bulbs with voltages less than LSL (lower specification limit) are scrapped & those with voltages above USL are reworked. If LSL= 11.8 & USL=12.2, how much is scrapped if the process small sigma (o) is cut by 25%?

 

ii) With unreduced variance, what's the PCR of the process?

Step by Step Solution

3.43 Rating (153 Votes )

There are 3 Steps involved in it

Step: 1

Solution i Given bulbs with LSL are scrapped and those with v... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Statistical Quality Control

Authors: Douglas C Montgomery

7th Edition

1118146816, 978-1-118-3225, 978-1118146811

More Books

Students also viewed these Mathematics questions

Question

4. Greet students at the door to the class every day.

Answered: 1 week ago