A company that makes industrial engines wants to prepare a master production schedule for November and December. These will be evenly distributed over the four

image text in transcribed A company that makes industrial engines wants to prepare a master production schedule for November and December. These will be evenly distributed over the four weeks in each month: 50 per week in June and 60 per week in July. Assume it is now the beginning of week 1 . The customer orders are 70 units for week 1,40 for week 2,20 for week 3,10 for week 4 , and 10 for week 6 . Inventory on hand is 20 (Beginning Inventory is 20). Use the MPS rule of ordering production when projected on-hand inventory would be negative without production. Suppose that the economic production quantity is 80 engines. Please prepare MPS table (like the MPS table given on page 18 of lecture 5 notes). Question 4 (20 points) A component used in a manufacturing facility is ordered from an outside supplier. The time-phased net requirements for the component over the next 7 weeks are 5, 25, 17, 15, 25,13 , and 27. Assume a holding cost of $1.5 per week and a setup cost of $42. 1) Determine the order policy for this item over the next 7 weeks based on Silver-Meal heuristic. 2) Assume there is a capacity constraint to the lot sizing a. Suppose that the maximum order size is 15 per week. Does there exist a feasible solution? b. Suppose that the maximum order size is 25 per week. Use lot-shifting technique to obtain a feasible solution (without using holding and setup cost). c. Suppose that the maximum order size is 25 per week. Improve the solution obtained in Part (b)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamentals of Management

Authors: Robbins, DeCenzo, Coulter

7th Edition

132996855, 0-13-610982-9 , 9780132996853, 978-0-13-61098, 978-0136109822

More Books

Students also viewed these General Management questions