Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A contractor is tendering for a road cutting to be blasted through a competent dolerite. He asks you for your assistance in designing a
A contractor is tendering for a road cutting to be blasted through a competent dolerite. He asks you for your assistance in designing a pre-split blast using the following parameters. Hole diameter: Vertical depth: Hole angle: 91mm 14.0m 73 There are significant penalties in the contract such that the contractor is prepared to put considerable effort into the drilling and blasting operation so as to minimize over break. You are asked to design the drilling pattern and the blast design and recommend an explosives and initiation system to achieve the best result possible. What should the standoff distance be for the main blast holes? Motivate your answer with the aid of sketches. Clearly state your assumptions. Design a blast with the following parameters. The muck pile needs to be thrown / casted into the void. Rock type: Competent sandstone Strip width: 45m Bench height: 28m Hole diameter: 238mm Explosives: Recommend the most suitable product Initiation system: Electronic delay detonators + 400g boosters Motivate your answer with the aid of sketches (Drill pattern and timing pattern). Clearly state your assumptions and any additional recommendations.
Step by Step Solution
★★★★★
3.39 Rating (161 Votes )
There are 3 Steps involved in it
Step: 1
Designing a presplit blast and a blast for casting muck pile into a void requires careful planning and consideration of various factors Lets address each scenario separately PreSplit Blast Design for ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started