A contractor is creating embankment for the North Spokane Corridor highway. It must move material from one location to another in their balanced earthwork project.

A contractor is creating embankment for the North Spokane Corridor highway. It must move material from one location to another in their balanced earthwork project. The fill section requires 100,000 CCY (compacted cubic yards) of material at a dry density of 115.5 lb/ft3. The material comes from a cut section with bank dry density of 110.0 lb/ft3. What volume of material (in BCY - bank cubic yards) must be extracted to supply the 100,000 CCY embankment (assume no waste, meaning everything they excavate makes it into the embankment)?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

To determine the volume of material in bank cubic yards BCY that must be extracted to supply the 100... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Thermodynamics An Engineering Approach

Authors: Yunus A. Cengel, Michael A. Boles

8th edition

73398179, 978-0073398174

More Books

Students also viewed these Accounting questions