Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A contractor wants to investigate the production and cost differences of using a 7S blade on a D7H dozer or an S blade on an

A contractor wants to investigate the production and cost differences of using a 7S blade on a D7H dozer or an S blade on an 824 dozer. The material is a dry clay, and it is to be moved a distance of 300 ft from the beginning of the cut. The dozing is downhill on a 5% grade. The operator will have average skill, the dozers have power-shift transmissions, and traction is assumed to be satisfactory. The site will be dusty. The material weighs 102.5 pcf in the bank state and has a 18% swell percentage. Job efficiency is assumed to be equivalent to a 50-min hour. Calculate the direct cost of the proposed earthmoving operation in dollars per bcy. Assume that the O&O cost for the D7 dozer is $175.00 per hour and $155.00 per hour for the 824. The operator's wage is $55.00 per hour plus 30% for fringes, workman's compensation, and other benefits.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Cash Flows

Authors: Cyril Joseph

1st Edition

B0B84RHX2D, B0CPV8WDGT

More Books

Students also viewed these General Management questions