A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n) a. actual costing
A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n) a. actual costing system. b. normal costing system. c. standard costing system. d. activity-based costing system