A damn has been commissioned to be utilized for hydroelectric power generation purposes. The required hydroelectric power expected to be generated is 100 MW; and
A damn has been commissioned to be utilized for hydroelectric power generation purposes. The required hydroelectric power expected to be generated is 100 MW; and a turbine with an efficiency of 95% has been procured. The falling head (height) of the dam is 60 m. Determine the penstock radius of required for the water to enter the turbine in order to generate the desired power.