Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A factory in Montreal furnishes parts to distribution centres in Waterloo and Toronto. The lead time of delivery from the factory to each of the

image text in transcribed

A factory in Montreal furnishes parts to distribution centres in Waterloo and Toronto. The lead time of delivery from the factory to each of the DCs is assumed to be one week. The distribution centre in Waterloo has a weekly demand of 40 products (end-items), and needs 2 parts to assemble a single product. Demands in Toronto are 30 products per week, but requires 3 parts per end-item (product). Each DC has an Economic Order quantity of 200 parts. Waterloo has an opening inventory of 100 parts; the initial stock in Toronto is 150 parts. The Montreal factory is itself supplied by air freight from overseas. The lead time is 1 week, with orders arriving in batches of 600. The factory begins with 400 parts in initial storage. Required: (a) Provide the DRP plan covering the next 9 weeks, for each of the DCs and the Montreal factory. (b) Now, instead of an EOQ policy, consider an LFL policy for the Waterloo DC. (You may wish to look up the meaning of Lot-For-Lot.") Make the changes necessary for all the DRP tableaux. (c) Suppose, in part (a), the factory in Montreal were to use a reorder policy with a reorder point of 200, rather than a DRP system. How would the factory's average inventory change? A factory in Montreal furnishes parts to distribution centres in Waterloo and Toronto. The lead time of delivery from the factory to each of the DCs is assumed to be one week. The distribution centre in Waterloo has a weekly demand of 40 products (end-items), and needs 2 parts to assemble a single product. Demands in Toronto are 30 products per week, but requires 3 parts per end-item (product). Each DC has an Economic Order quantity of 200 parts. Waterloo has an opening inventory of 100 parts; the initial stock in Toronto is 150 parts. The Montreal factory is itself supplied by air freight from overseas. The lead time is 1 week, with orders arriving in batches of 600. The factory begins with 400 parts in initial storage. Required: (a) Provide the DRP plan covering the next 9 weeks, for each of the DCs and the Montreal factory. (b) Now, instead of an EOQ policy, consider an LFL policy for the Waterloo DC. (You may wish to look up the meaning of Lot-For-Lot.") Make the changes necessary for all the DRP tableaux. (c) Suppose, in part (a), the factory in Montreal were to use a reorder policy with a reorder point of 200, rather than a DRP system. How would the factory's average inventory change

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Internal Auditors Manual And Guide The Practitioners Guide To Internal Auditing

Authors: Milton Stevens Fonorow

1st Edition

0134711947, 978-0134711942

More Books

Students also viewed these Accounting questions

Question

Identify cultural barriers to communication.

Answered: 1 week ago