A factory makes 3 components, A, B and C using the same production process for each. A unit of A take 1 hr, a unit
- A factory makes 3 components, A, B and C using the same production process for each. A unit of A take 1 hr, a unit of B takes 0.75 hrs and a unit of C takes 0.5 hrs. In addition, C has to be hand finished, an activity taking 0.25 hrs per unit. Each week total production time (excluding hand finishing) must not exceed 300 hrs and hand finishing must not exceed 45 hrs. The components are finally assembled to make two finished products. One product consists of 1 unit of A and 1 unit of C selling for 30 pounds whilst the other consists of 2 units of B and 1 unit of C and sells for 45 pounds. At most 130 of the first product and 100 of the second product can be sold each week. Formulate the problem of planning weekly production to maximize total proceeds as a linear programming problem in 2 variables and obtain the solution graphically.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started