Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A flexible manulacturing cell consists of two machining workstations, one quality inspection station plus a loadunioad station. The loadurload station is station 1 with one

image text in transcribed
A flexible manulacturing cell consists of two machining workstations, one quality inspection station plus a loadunioad station. The loadurload station is station 1 with one server (human worker). Station 2 consists of one CNC machining center. Station 3 has two CNC drill presses. The quality inspection station is station 4 with one server (human worker). The four stations are connected by a part-handing system (addressed as station 5) that has one work carrier. The mean transport time is 1.5min. The FMC produces three parts, A. B, and C. The part mix fractions and process roubings for the three parts are presented in the table below. Pay attention to the operation orders. D a) woekload of each station in the syatem (including part handling) b) workload per server for each statioe in the sysem (including part handling) c) 10 of staties d) maximum production rate of the FMC : perith (5 peints total) a) corveipondine probection rates of cach prodact f) utilinatioe of cach station in the system (including part bandling) A flexible manulacturing cell consists of two machining workstations, one quality inspection station plus a loadunioad station. The loadurload station is station 1 with one server (human worker). Station 2 consists of one CNC machining center. Station 3 has two CNC drill presses. The quality inspection station is station 4 with one server (human worker). The four stations are connected by a part-handing system (addressed as station 5) that has one work carrier. The mean transport time is 1.5min. The FMC produces three parts, A. B, and C. The part mix fractions and process roubings for the three parts are presented in the table below. Pay attention to the operation orders. D a) woekload of each station in the syatem (including part handling) b) workload per server for each statioe in the sysem (including part handling) c) 10 of staties d) maximum production rate of the FMC : perith (5 peints total) a) corveipondine probection rates of cach prodact f) utilinatioe of cach station in the system (including part bandling)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

ISE Operations And Supply Chain Management

Authors: F. Robert Jacobs, Richard B. Chase

16th International Edition

1260575942, 978-1260575941

Students also viewed these General Management questions