A furniture factory manufactures custom-designed tables in two grades. Grade A tables require 1 hour of assembling and 2 hours finishing. Grade B tables require
A furniture factory manufactures custom-designed tables in two grades. Grade A tables require 1 hour of assembling and 2 hours finishing. Grade B tables require 1 hour of assembling and 1 hour finishing. If there are 800 hours available for assembly and 1200 hours available for finishing, how many of each grade of table should be manufactured